Plan an ADU’s utilities before you finalize its layout. The location and condition of existing sewer, water, and electrical services can affect where rooms fit, how much excavation is needed, and which approvals or upgrades belong in the budget. An attractive floor plan is only a starting point until those connections are evaluated.
Start by identifying the property’s actual city and utility providers. A Los Angeles mailing address does not necessarily mean the City of Los Angeles or LADWP controls every part of the project. Confirm the applicable agencies before relying on a neighbor’s experience or a generic cost estimate.
Create a basic utility record for the property
Gather existing plans, available permit records, utility account information, and photographs of accessible equipment. Ask your project team to document what is known and what still needs investigation. A visual walk-through may identify equipment locations, but it does not establish underground routes or available system capacity.
- Where are the existing water service, shutoffs, electrical service, and sewer connection?
- Which routes would connect the proposed ADU to those systems?
- What paving, landscaping, structures, or access constraints lie along those routes?
- Which measurements, inspections, calculations, or utility responses are needed before pricing?
For a conversion, our garage dimensions guide addresses space planning. Utility feasibility is a separate check; an adequately sized garage does not automatically have suitable services.
Sewer: verify the route and condition before fixing the bathroom location
Ask the plumbing professional how the proposed kitchen, bathroom, and laundry would drain, where they connect, and what investigation is appropriate for the existing line. Distance alone is not enough to establish a workable connection. Elevation, existing condition, cleanout access, and other site constraints may affect the design.
Request a clear distinction between work inside the ADU, work on the private property, and any work involving the public connection or right-of-way. Identify who obtains each required approval and who restores disturbed paving or landscaping. Do not assume every ADU needs an entirely independent sewer connection, or that an existing connection can always be reused without changes.
Water: review demand, routing, and service requirements together
The proposed fixtures and equipment should be part of the water-service discussion. Ask whether the existing service is suitable, how shutoffs will work, what route is feasible, and whether the provider requires additional review. Separate metering and billing questions should be confirmed with the actual provider and applicable rules rather than treated as universal requirements.
If the main home already has aging or problematic plumbing, decide whether related repairs belong in the same project. Our repipe-or-repair guide can help organize that conversation without assuming a full repipe is necessary.
Electrical: use the planned equipment, not a rule of thumb
List the proposed cooking equipment, water heater, heating and cooling, laundry, lighting, and any future loads you want considered. Have the electrical design and available service evaluated by the appropriate professionals. The number printed on an existing panel does not by itself settle whether the complete property can support the proposed work.
For LADWP-served properties, its residential electric-service request page includes an ADU pathway and a way to track service requests. Coordinate that process early if the project needs new or revised service; the construction schedule should account for the utility’s requirements and response.
Read our electrical panel planning guide for questions to discuss. An upgrade is a project-specific determination, not an automatic requirement for every ADU.
Put utility work into the estimate explicitly
Ask the proposal to identify investigation, design, applications, trenching, piping or conduits, equipment, inspections, connection work, and surface restoration. Clarify which items are fixed-price, allowances, or excluded pending further information. Keep utility-provider charges separate from the contractor’s installation scope so responsibilities are clear.
Our ADU financing guide can support the broader budget discussion. Before making financing decisions, obtain current terms and a project-specific cost plan rather than treating an early construction estimate as the complete amount required.
Make the utility plan part of the design handoff
Before final design approval, ask for a simple record of the proposed routes, equipment locations, responsible parties, unresolved questions, and next approval steps. Confirm how the main home will be affected by excavation and temporary interruptions. Keep a contingency for discoveries that could not reasonably be confirmed earlier.
For City of Los Angeles projects, consult LADBS plan review and permitting with your project team. Other jurisdictions and providers may use different processes. This guide is a planning checklist, not an installation specification or approval.
Explore SB’s ADU and garage-conversion services and share your property and proposed use. Bringing utility questions into the first design conversation helps build a scope that reflects the actual site.